Track A · Network activation

Get the first modem online.

Prove the complete access path with one real device: build the network foundation, define the service, register the modem, and verify that the NOC can see its health.

Done means Online · shaped · visible One CPE registers, receives the intended service profile, and appears healthy in monitoring.
  1. 01 Build the network foundation Configure the NetGw or CMTS, IP pools, and the vendor-specific hardware path. Done when: the access gateway and address pools are ready
  2. 02 Define the service Create QoS, the configuration file, and the minimum product and cost-center data required by the go-live stack. Done when: a contract can receive a sellable service profile
  3. 03 Activate the device Create the customer or contract and assign the modem MAC to the correct configuration. Done when: the first modem registers online
  4. 04 Verify in the NOC Review channels, sessions, thresholds, and history in Prime Monitoring. Done when: operations can see and diagnose the device

What to prepare

Prepare the data and decisions before touching the first modem.

The canonical Provisioning Setup contains eight technical tasks. Grouping them into these six work packages makes ownership and acceptance clearer.

01

Access gateway

  • NetGw or CMTS management address
  • DOCSIS, FTTH, DSL, or WiFi hardware path
  • Vendor plug-in and credentials where required
02

IP foundation

  • Device and customer IP pools
  • Router, DNS, and lease parameters
  • Reachability from provisioning services
03

Service profile

  • QoS profile and speed policy
  • CM, MTA, or TR-069 configuration
  • A safe default configuration for the pilot
04

Commercial minimum

  • Cost center
  • Product and tariff mapping
  • Full company and SEPA setup can follow for settlement
05

Pilot device

  • Customer or contract record
  • Modem MAC and inventory identity
  • Config-file assignment and restart
06

Acceptance evidence

  • Device reaches online state
  • Expected speed profile is enforced
  • Monitoring shows usable signal and session data

Provisioning and verification

Watch the model, then inspect the operational views.

The published training covers the provisioning model end to end. The screenshots are archive captures and are labelled as such rather than presented as the current interface.

Apps in this journey

The smallest complete activation stack.

These apps own distinct parts of the first-device outcome; Product and Billing provide the commercial minimum documented in the go-live stack.

Source material

Related journey

Plan one device as a real acceptance test.

Bring the gateway, address pools, product data, pilot MAC, and success criteria; we will map the shortest reliable path to online.

Book a strategy call